Install @critical-path/mcp in Devin Desktop

What you need first

  • Devin Desktop, installed.
  • Node.js, which gives the npx command the server starts with.

Steps

  1. Open ~/.config/devin/mcp_config.json, or create it. On Windows it is %APPDATA%\devin\mcp_config.json.
  2. Add this block. If the file already has mcpServers, add only the entry inside it.
{
  "mcpServers": {
    "critical-path": {
      "command": "npx",
      "args": ["-y", "@critical-path/mcp"]
    }
  }
}
  1. Save the file and restart Devin Desktop.

Check it worked

Ask Devin Desktop: List the tools of critical-path.

If it does not start

spawn npx ENOENT
Node.js is not on the PATH that Devin Desktop sees. Install it, or write the full path of npx in the config.
Nothing changes after a restart
The file is not valid JSON any more. Look for a missing comma where the block was added.

Back to @critical-path/mcp