Install @critical-path/mcp in LM Studio
What you need first
- LM Studio, installed.
- Node.js, which
gives the
npxcommand the server starts with.
Steps
- In LM Studio, open the Program tab and choose Install › Edit mcp.json.
- Add this block. If the file already has
mcpServers, add only the entry inside it.
{
"mcpServers": {
"critical-path": {
"command": "npx",
"args": ["-y", "@critical-path/mcp"]
}
}
} - Save the file and restart LM Studio.
Check it worked
Ask LM Studio: List the tools of critical-path.
If it does not start
- spawn npx ENOENT
- Node.js is not on the PATH that LM Studio sees. Install it, or write the
full path of
npxin the config. - Nothing changes after a restart
- The file is not valid JSON any more. Look for a missing comma where the block was added.