Install @critical-path/mcp in Augment Code

What you need first

  • Augment Code, installed.
  • Node.js, which gives the npx command the server starts with.

Steps

  1. Open ~/.codex/config.toml, or create it. The Codex CLI, its IDE extension and the ChatGPT desktop app share this file.
  2. Add this table at the end of the file.
{
  "mcpServers": {
    "critical-path": {
      "command": "npx",
      "args": ["-y", "@critical-path/mcp"]
    }
  }
}
  1. Save the file and restart Augment Code.

Check it worked

Ask Augment Code: List the tools of critical-path.

If it does not start

spawn npx ENOENT
Node.js is not on the PATH that Augment Code sees. Install it, or write the full path of npx in the config.
Nothing changes after a restart
The file is not valid JSON any more. Look for a missing comma where the block was added.

Back to @critical-path/mcp