Install McpStamp Change Orders in LM Studio

What you need first

  • LM Studio, installed.
  • Nothing else: the server runs on its publisher's machines and LM Studio connects to it.

Steps

  1. In LM Studio, open the Program tab and choose Install › Edit mcp.json.
  2. Add this block. If the file already has mcpServers, add only the entry inside it.
{
  "mcpServers": {
    "change-order": {
      "url": "https://mcp.zovo.one/mcp/change-order"
    }
  }
}
  1. Save the file and restart LM Studio.

Check it worked

Ask LM Studio: List the tools of change-order.

If it does not start

401 Unauthorized
The endpoint wants a sign-in or a key. Sign in when LM Studio asks.
Nothing changes after a restart
The file is not valid JSON any more. Look for a missing comma where the block was added.

Back to McpStamp Change Orders